6-8) A total of 500 metres - 32mm Pipe laying @ 800mm apart followed by careful back-filling of trench. 9-12) Manifold Chamber constructed and partly installed by Scott, our ECOVISION SYSTEMS Engineer (helped by his canine assistant, Archie!). 13) Groundwork complete. 14-15) Manifold Chamber construction complete. |