The profiles which carry the Glass Ballustrade prove difficult to allign accurately when fixing highly engineered aluminium to wood floor joists which can vary by just 1mm in the levels coupled with 4 internal corners and 2 externals but eventually the work is completed successfully. Ian completes his marathon plastering work and we begin decorating.

The Gyvlon floor was found to be out of level at the front entrance doors but some careful grinding with specialist equipment soon solved the problem, the floor was then sealed before tiling commenced.

 GlassBallustrade1thumbGlassBallustrade2thumb1Kitchen1thumbDecorating1thumb
FloorLevelling2thumb
 
 Floorlevelling1thumbducks09thumbKitchenfit1thumbKitchenfit2thumb
stDoorthumb

Donald (duck) and his new 'friend' return after a long absence to sample the delights of the newly formed pond which appeared after heavy rainfall and on 30th March, Mark Zealand and his team of kitchen fitters arrive and make short work of fitting our beautiful kitchen units. The team work very well together liaising with us at each stage and we are delighted with the result.

July2a2
thequadra2

MARCH 2009