2:7:08
The scaffolding is erected and blockwork reaches 1st floor joists height.
Metal Web Engineered Joists arrive from Kingspan in Milton Keynes with Steels awaiting arrival on Site to set out 1st floor structure.
10:7:08
The inclement weather has not slowed the work down and internal blockwork is now at 1st floor level.
Cavity wall insulation is fitted and facing brickwork will be laid to same level before Steels and 1st floor Joists are fitted.
JULY 2008